UPS Jacksonville Hub

UPS Jacksonville Hub

Removed and replaced over 10,000 square yards of existing parking lot asphalt.

Performed extensive concrete paving repairs to damaged areas throughout the truck lot. Project was begun late in the year near thanksgiving in which case concrete slabs that were poored had to be ready fro heavy loads within 24 hours of pooring the concrete.

They also required structual base modifications for slabs that were previously poorly repaired.