Photo Gallery

Ed White High School - Duval County School Board

Ed White High School - Duval County School Board

Originally built in the early 1970’s, existing under ground utilities proved very challenging to lay new underground utilities beneath

Installed several new reinforced concrete storm drain lines with 5 ton 10’ deep catch basins

Reclaimed and paved over 6,000 square yards of existing parking lot

Project totaled $500,000 and was completed in the

View Project
Thomas Street - City of Jacksonville

Thomas Street - City of Jacksonville

Milled and resurfaced over 5 miles of city streets in less than 3 days

Full depth milling and haul off was performed. All the way down to the lime rock base

Project totaled $120,000

View Project
Naval Air Station Jacksonville - Hospital Renovation

Naval Air Station Jacksonville - Hospital Renovation

Installed 200’ of 6” PVC Water Main

Connected and cut existing asbestos pipe

Installed 150’ of 24” Reinforced Concrete Pipe

Installed 8” of Lime Rock base and paved 2” of Hot Mix Asphalt over 8,000 square yards of the renovated parking lot

Project totaled $350,000 and was completed in the fall of 2011 taking

View Project
Camp Blanding - Army National Guard Roadway Culvert Renovation

Camp Blanding - Army National Guard Roadway Culvert Renovation

Remove collapsing 60” metal roadway culvert

Environmentally sound site: no wildlife or vegetation were allowed to be harmed or disturbed

No contamination or turbidity of water flow allowed

Replaced collapsed metal pipe with 60” concrete Box Culvert and 20’ wing walls

Naturally occurring fresh water stream had to be dammed and re-routed with using

View Project
Lee High School

Lee High School

Originally built in the 1940's, there was a maze of underground lines to work around.

We installed over 1,000' of temporary utilities to portable buildings. we also performed a significant amount of grading and paving on site for temporary use while students were relocated out of the main buildings for interior

View Project
Jacksonville City Streets

Jacksonville City Streets

Milled and Paved over 10 miles of city owned and maintained streets. the streets were very dated and plagued by potholes and ever eroding potholes.

View Project
UPS Jacksonville Hub

UPS Jacksonville Hub

Removed and replaced over 10,000 square yards of existing parking lot asphalt.

Performed extensive concrete paving repairs to damaged areas throughout the truck lot. Project was begun late in the year near thanksgiving in which case concrete slabs that were poored had to be ready fro heavy loads within 24 hours

View Project
Sawgrass Golf and Country Club Parking Lot

Sawgrass Golf and Country Club Parking Lot

Reclaimed apporx. 10,000 square yards of existing asphalt parking lot.

The parking lot had to remain open in order for the clubs thousands of members to still be able to access the club while construction took place.

The project took a total of ten working days with the finish making a vast

View Project
North Shore Elementary School - Duval County Public Schools

North Shore Elementary School - Duval County Public Schools

Total new construction of a 10 acre public school

Included clearing, drainage, and underground utilities as well as over 10,000 s.y. of asphalt paving

Project was completed in 8 months and the job totaled $1.6 million

View Project
Costco Entrance Modifications

Costco Entrance Modifications

Widened The entrance from 3 to 4 lanes to a mega box store at one of the busiest intersections in the city of Jacksonville

All work was required to be done at night so the store could remain open during all hours of the day.

Entrance roadway had to be completely cleaned

View Project
Naval Air Station Jacksonville Patrol Road Restoration

Naval Air Station Jacksonville Patrol Road Restoration

Project currently under way and expected to be completed in fall of 2013•Includes nearly 1 mile of full depth road way reconstruction

Nearly 2,000 feet of concrete ditch paving

1.5 miles of 18-24 inch concrete storm drainage pipe

Includes ½ acre of 20 foot deep pond dug in an area that has irregularly

View Project